Description: DRA Global designed the Water treatment plant and BIM Aforika designed the Overhead Crane maintenance stairs as well Agitator & Reactor Crawl beams. Laser scanning was implemented to capture the existing structure efficiently and used the Point clouds as the reference for our design. Our designed intent was collaborated with the client using CDE (Common Data Environment) to access the design info online when ever needed.
Description: A 3 Bay mine workshop was designed for the purposes of mine heavy-duty vehicle maintenance such as Dump trucks, Track dozers etc...
Description: A structural integrity assessment of the Rolling ring Crusher building was done to determine if the existing structure can be able to load a 15Ton Over head crane and also extend the cantilever end side to allow easy loading & offloading on the crane.